Plan Company

Plan Company is one of the nation’s best contracting companies. It has grown to become a first class company that works at international standards in several different fields. Plan Company was established in 2001 with its headquarters based in Sulaymaniyah, it has now grown to operate in Kirkuk, Erbil, and other districts. Plan Company is stretching out and has grown from a local contracting company to become a national contractor with a reputation for outstanding work and high quality.

The company’s extensive experience in the different fields together with its highly experienced local and international staff, its contact with all the major suppliers around the world, and being a part of Faruk Group Holding, Plan Company has embraced all the core values of its mother company.

 

0
Year
Established
0
Projects
Completed
0
Awards
Won

Services

  • Engineering feasibility studies
  • Project management
  • Electrical substations – designing, supplying, installing, testing, and commissioning
  • Power distribution – planning, designing, rehabilitating, and constructing
  • Power transmission – planning design, rehabilitating, and constructing
  • Underground electric cable
  • Construction – residential and industrial, building foundations, roads design, implementation and project delivery
  • Material supply of various equipment for electrical and mechanical projects
  • Tender document preparation and evaluation
  • Telecommunication services
  • Water Sectors: Constraction of Dam, Water Supply and Network pipe Lines

Our series adapt and converge with the individual requirements of the customer.

A MESSAGE FROM THE CHAIRMAN

Plan Company first began operations within the construction industry; we then expanded the scope of our work to include electricity, telecommunication services, the fields of water, nature conservation, infrastructure, and investment.

Plan Company’s future perspectives is focused on fulfilling our objectives through strengthening our existing partnerships and cooperations with credible, international companies, as well as creating new ones to supply a benefit for the communities we work in.

With the privatization of utilities, we intend to expand our services to include the supply of electricity, water, and recycling as part of the private sector using efficient modem methods and technologies. We have, over the years, remained committed and resilient in finding opportunities to help us sustain and grow our years of experience and work to ensure the sustainability of essential services in our region.

Tahsin Kader Ali

COMPLETED PROJECTS

Our degree of professionalism and ethical, high quality of work has enabled us to complete small and large scale projects at all complexities.

Previous slide
Next slide

Stage 4 of the Electrical Power Substations in the Sulaymaniyah Governorate

Project consisting of designing, Engineering, Equipment Purchasing, Construction, Testing and Commissioning of five (5) new 33/11KV Substations, extension of five (5) 132/33/11KV Substations and extension of one (1) 33/11KV Substation.

  • Duration: 21 months
  • Commencement date: 25.05.2009
  • Completion Date: 06.04.2011
  • Budget: $ 58,391,302
  • Employer: Ministry of Electricity, KR

Telecommunications Projects

Project consisting of Construction of seventeen (17) GSM sites with the installation of electrical and telecom equipment (BTS and Microwave equipment)

  • Duration: 60 days
  • Commencement date: 01.01.2011
  • Completion Date: 01.03.2011
  • Budget: $ 300,000
  • Employer: AsiaCell – GSM, Iraq

Construction and Rehabilitation of Gli-Jal, Pishta and Snoor Road

Project consisting of cutting, graveling and asphalting of 19.4 KM road.

  • Duration: 365 days
  • Commencement date: 09.11.2009
  • Completion Date: 07.11.2010
  • Budget: $ 2,289,320
  • Employer: Directorate of Housing and Reconstruction, Sulaymaniyah, KRG

 

Construction of Vehicle Weighing Scale (Load Cells)

Project consisting of construction, Equipment Purchasing and Installation of three (3) Vehicle Weighing Scales in Sulaymaniyah, KRG.

  • Duration: 386 days
  • Commencement date: 10.04.2009
  • Completion Date: 06.05.2010
  • Budget: $ 3,532,096
  • Employer: Directorate of Housing and Reconstruction, Sulaymaniyah, KRG

Sulaymaniyah – Arbat Highway lighting

Project consisting of designing, engineering, Material Supply, Construction of a Conventional and Solar Street Lighting of 6 KM highway, between Sulaymaniyah and Arbat  district 

  • Duration: 345 days
  • Commencement date: 23.05.2009
  • Completion Date: 05.05.2010
  • Budget: $ 2,886,288
  • Employer: Municipality of Sulaymaniyah, Sulaymaniyah Governorate.

Upgrading the existing Electrical Substations of North Gas Company in Kirkuk/Iraq

Project consisting of designing, Material Supply, Installation, testing and commissioning of one (1) 33/3.3kV Substation and two (2) 3.3/0.4kV Substations.

  • Duration: 35 weeks
  • Commencement date: 01.08.2009
  • Completion Date: 05.05.2010
  • Budget: $ 6,502,196
  • Employer: North Gas Company in Kirkuk, Iraq

Stage 1 of Sulaymaniyah Electrical Power Substations Spare Parts

Project consisting of supplying of spare parts for stage 1 of Sulaymaniyah electrical Substations three (3) 132/33/11kV and five (5) 33/11kV).

  • Duration: 225 days
  • Commencement date: 06.06.2007
  • Completion Date: 15.02.2008
  • Budget: $ 4,000,000
  • Employer: General Directorate of Electricity, Sulaymaniyah, KRG

Supplying of Safety Materials

  • Duration: 120 days
  • Commencement date: 09.07.2006
  • Completion Date: 09.01.2007
  • Budget: $ 1,130,000
  • Employer: Ministry of Electricity, KRG

Supplying of a 5MVA Power Generator and Transformer

  • Duration: 360 days
  • Commencement date: 11.05.2005
  • Completion Date: 01.12.2006
  • Budget: $ 4,800,000
  • Employer: Ministry of Electricity, KRG

Supplying of 80 Pieces Generators, From (40 to 1250) KVA Generators,

  • Duration: 35 days
  • Commencement date: 18.09.2006
  • Completion Date: 23.10.2006
  • Budget: $ 620,690
  • Employer: General Directorate of Electricity, Kirkuk, Iraq

Sulaymaniyah International Airport Electrical Power Substation

Project consisting of designing, material delivery, construction, installation and commissioning of one (1) new 33kV double circuit transmission line and two (2) new 5 MVA – 33/11kV substations for Sulaymaniyah International Airport .

  • Duration: 516 days
  • Commencement date: 12.03.2005
  • Completion Date: 14.08.2006
  • Budget: $ 2,350,000
  • Employer: Sulaymaniyah International Airport, KRG