Plan Company

Plan Company is one of the nation’s best contracting companies. It has grown to become a first class company that works at international standards in several different fields. Plan Company was established in 2001 with its headquarters based in Sulaymaniyah, it has now grown to operate in Kirkuk, Erbil, and other districts. Plan Company is stretching out and has grown from a local contracting company to become a national contractor with a reputation for outstanding work and high quality.

The company’s extensive experience in the different fields together with its highly experienced local and international staff, its contact with all the major suppliers around the world, and being a part of Faruk Group Holding, Plan Company has embraced all the core values of its mother company.

 

Year
Established
0
Projects
Completed
0
Awards
Won
0

Services

  • Engineering feasibility studies
  • Project management
  • Electrical substations – designing, supplying, installing, testing, and commissioning
  • Power distribution – planning, designing, rehabilitating, and constructing
  • Power transmission – planning design, rehabilitating, and constructing
  • Underground electric cable
  • Construction – residential and industrial, building foundations, roads design, implementation and project delivery
  • Material supply of various equipment for electrical and mechanical projects
  • Tender document preparation and evaluation
  • Telecommunication services
  • Water Sectors: Constraction of Dam, Water Supply and Network pipe Lines

Our series adapt and converge with the individual requirements of the customer.

A MESSAGE FROM THE CHAIRMAN

Plan Company first began operations within the construction industry; we then expanded the scope of our work to include electricity, telecommunication services, the fields of water, nature conservation, infrastructure, and investment.

Plan Company’s future perspectives is focused on fulfilling our objectives through strengthening our existing partnerships and cooperations with credible, international companies, as well as creating new ones to supply a benefit for the communities we work in.

With the privatization of utilities, we intend to expand our services to include the supply of electricity, water, and recycling as part of the private sector using efficient modem methods and technologies. We have, over the years, remained committed and resilient in finding opportunities to help us sustain and grow our years of experience and work to ensure the sustainability of essential services in our region.

Tahsin Kader Ali

COMPLETED PROJECTS

Our degree of professionalism and ethical, high quality of work has enabled us to complete small and large scale projects at all complexities.

Previous slide
Next slide

33kV Underground Cable Project between Zargata and Grdy Joga, South Sulaymaniyah and Qirga, South Sulaymaniyah and Tanjaro, Rizgary New and 60 Meter Street in Sulaymaniyah Governorate.

Project consisting of designing, engineering, material delivery and construction of laying cable between Zargata and Grdy Joga, South Sulaymaniyah and Qirga, South Sulaymaniyah and Tanjaro, Rizgary New and 60 Meter Street in Sulaymaniyah 

  • Duration: 560 days
  • Commencement date: 04.06.2012 
  • Completion Date: 14.12.2013
  • Budget: $ 9,997,444
  • Employer: Ministry of Electricity, KRG

 

Hawary Shar Park Project

Project consisting of designing, engineering, material delivery and construction of laying cable between Hawary Shar substation to Hawary Shar park and lightning the roads inside and outside the park.

  • Duration: 22 months
  • Commencement date: 05.01.2012
  • Completion Date: 14.10.2013
  • Budget: $ 16,833,333
  • Employer: Presidency of Sulaymaniyah Municipality, KRG

Street Light install in Bazyan – Phase one Bazian Main street, Phase Two Bazian Sub-Street.

Project consisting of designing, engineering, construction of laying cable, lightning the roads in Bazian District Sulaymaniyah Governorate.

  • Duration: 190 days
  • Commencement date: 17.06.2012
  • Completion Date: 30.08.2013
  • Budget: $ 573,743
  • Employer: General Directorate of Electricity in Sulaymaniyah.

 

Renovation and Development of Gharnata Street in Kirkuk

  • Duration: 540 days
  • Commencement date: 05.01.2012
  • Completion Date: 28.06.2013
  • Budget: $ 9,580,313
  • Employer: Kirkuk Governorate, Kirkuk, Iraq

Construction of 18 Classes School in Badawa (Galawezhan)

project consisting of Design, engineering, procurement, construction (EPC), testing and commissioning of OHTL line with, in Erbil Governorate.  

  • Duration: 420 days
  • Commencement date: 29.05.2013
  • Completion Date: ONGOING
  • Budget: $ 3,640,130 IQD 2,053,856,000
  • Employer: Department of Schools Erbil Governorate, KRG

Construction of Koya Culture Center

Project consisting of engineering, procurement and construction (EPC) of Koya cultural Center.

  • Commencement date: 20.05.2013 
  • Completion Date: ONGOING
  • Budget: $ 2,077,235
  • Employer: University of Koya , KRG 

Shaterlo – Almas Road and Sewer System Development

  • Duration: 220 days
  • Commencement date: 09.09.2012
  • Completion Date: 17.04.2013
  • Budget: $ 1,404,713
  • Employer: Municipality of Kirkuk, Iraq

Qader Karam Retaining Wall Construction

  • Duration: 120 days
  • Commencement date: 27.09.2012
  • Completion Date: 25.01.2013
  • Budget: $ 398,082
  • Employer: Municipality of Qader Karam, KRG

Shary Jwan/Grand Millennium Hotel Sulaymaniyah 33KV Electrical Power Substation

Project consisting of designing, manufacture, factory testing, delivery of equipment, Engineering services and construction (EPC) of one (1) new 33/11kV, two (2) new 31.5, MVA Substation for power supply of Grand Millennium Hotel in Sulaymaniyah Governorate in Kurdistan, KRG.

  • Duration: 12 months
  • Commencement date: 15.01.2011
  • Completion Date: 15.01.2013
  • Budget: $ 5,137,864
  • Employer: Faruk Group Holding, Sulaymaniyah Governorate.

Construction of Taq Taq Library

  • Duration: 15 months
  • Commencement date: 01.11.2011
  • Completion Date: 10.01.2013
  • Budget: $ 386,750
  • Employer: Taq Taq Operating Company Limited, KRG

Faruk Medical City Cabling Project

  • Duration: 7 months
  • Commencement date: 10.02.2012
  • Completion Date: 13.08.2012
  • Budget: $ 311,192
  • Employer: Faruk Group Holding, Sulaymaniyah, KRG

33kV Substation and Laying Cable Kirkuk, Iraq

  • Duration: 180 days
  • Commencement date: 13.02.2012
  • Completion Date: 11.08.2012
  • Budget: $ 1,759,860
  • Employer: General Directorate of Electricity, Kirkuk, Iraq

 