Plan Company

Plan Company is one of the nation’s best contracting companies. It has grown to become a first class company that works at international standards in several different fields. Plan Company was established in 2001 with its headquarters based in Sulaymaniyah, it has now grown to operate in Kirkuk, Erbil, and other districts. Plan Company is stretching out and has grown from a local contracting company to become a national contractor with a reputation for outstanding work and high quality.

The company’s extensive experience in the different fields together with its highly experienced local and international staff, its contact with all the major suppliers around the world, and being a part of Faruk Group Holding, Plan Company has embraced all the core values of its mother company.

 

Year
Established
0
Projects
Completed
0
Awards
Won
0

Services

  • Engineering feasibility studies
  • Project management
  • Electrical substations – designing, supplying, installing, testing, and commissioning
  • Power distribution – planning, designing, rehabilitating, and constructing
  • Power transmission – planning design, rehabilitating, and constructing
  • Underground electric cable
  • Construction – residential and industrial, building foundations, roads design, implementation and project delivery
  • Material supply of various equipment for electrical and mechanical projects
  • Tender document preparation and evaluation
  • Telecommunication services
  • Water Sectors: Constraction of Dam, Water Supply and Network pipe Lines

Our series adapt and converge with the individual requirements of the customer.

A MESSAGE FROM THE CHAIRMAN

Plan Company first began operations within the construction industry; we then expanded the scope of our work to include electricity, telecommunication services, the fields of water, nature conservation, infrastructure, and investment.

Plan Company’s future perspectives is focused on fulfilling our objectives through strengthening our existing partnerships and cooperations with credible, international companies, as well as creating new ones to supply a benefit for the communities we work in.

With the privatization of utilities, we intend to expand our services to include the supply of electricity, water, and recycling as part of the private sector using efficient modem methods and technologies. We have, over the years, remained committed and resilient in finding opportunities to help us sustain and grow our years of experience and work to ensure the sustainability of essential services in our region.

Tahsin Kader Ali

COMPLETED PROJECTS

Our degree of professionalism and ethical, high quality of work has enabled us to complete small and large scale projects at all complexities.

Previous slide
Next slide

Sulaymaniyah University Campus Substation Project

Project consisting of designing, factory testing, delivery of equipment, Engineering services and construction (EPC), on-job site training for the construction of one (1) new 33/11kV and two(2) new 16MVA substation including of connecting these to the local network/terminal towers by 33kV XLPE cables in Sulaymaniyah Governorate in Kurdistan – KRG.

  • Duration: 12 months
  • Commencement date: 30.06.2011
  • Completion Date: 28.06.2012
  • Budget: $ 3,270,833
  • Employer: Ministry of Electricity, KRG

Cable Installation of Imam Qassim Substation

  • Duration: 180 days
  • Commencement date: 15.11.2011
  • Completion Date: 13.05.2012
  • Budget: $ 1,849,023
  • Employer: General Directorate of Electricity, Kirkuk, Iraq 

Shary Jwan/Grand Millennium Hotel Sulaymaniyah Cabling Project

  • Duration: 13 months
  • Commencement date: 01.02.2011
  • Completion Date: 15.03.2012
  • Budget: $ 254,911
  • Employer: Faruk Group Holding, Sulaymaniyah, KRG

Kleesa Irrigation Project – 40,000 Acres – Erbil, Koya – Klesa

  • Duration: 300 days
  • Commencement date: 17.05.2011
  • Completion Date: 12.03.2012
  • Budget: $ 439,024
  • Employer: Ministry of Agriculture and Water Recourses, KRG

Fanoos Telecommunication Project

  • Duration: 133 days
  • Commencement date: 20.09.2012
  • Completion Date: 25.02.2012
  • Budget: $ 94,267
  • Employer: Fanoos Telecom, Kirkuk, Iraq

Daquq Sewage System Design Project

  • Duration: 120 days
  • Commencement date: 13.09.2011
  • Completion Date: 11.01.2012
  • Budget: $ 355,833
  • Employer: Directorate of Sewage, Kirkuk, Iraq

Aliwa 3×3 Vault

  • Duration: 97 days
  • Commencement date: 19.09.2011
  • Completion Date: 25.12.2011
  • Budget: $ 70,601
  • Employer: Ministry of Electricity, KRG

Shahidan Health Center Construction Project

Project consisting of designing, engineering, material delivery and renovation of one (1) health center in Erbil, KRG

  • Duration: 419 days
  • Commencement date: 24.10.2010
  • Completion Date: 17.12.2011
  • Budget: $ 788,864
  • Employer: Ministry of Health, General Directorate of Health, Erbil, KRG

Bazian grid connection Project 132/11kV AIS

63 MVA Substation at Bazian cement plant Sulaymaniyah, Kurdistan, KRG.

Project consisting of designing, manufacture, factory testing, delivery of equipment, Engineering services and construction (EPC) of Bazian grid connection

Project 13/11kV AIS, 63 MVA Substation at Bazian Cement Plant Sulaymaniyah, Kurdistan, KRG.

  • Duration: 10 months
  • Commencement date: 15.02.2011
  • Completion Date: 15.12.2011
  • Budget: $ 5,390,000
  • Employer: Bazian Cement Plant – Lafarge, KRG

Goizha City Cabling Project

  • Duration: 8 months
  • Commencement date: 12.03.2011
  • Completion Date: 20.11.2011
  • Budget: $ 234,705
  • Employer: Faruk Group Holding, Sulaymaniyah, KR

Najdi Haider Health Center Construction Project

Project consisting of designing, engineering, material delivery and renovation of one (1) health center in Erbil, KRG

  • Duration: 395 days
  • Commencement date: 14.10.2010
  • Completion Date: 13.11.2011
  • Budget: $ 802,405
  • Employer: Ministry of Health, General Directorate of Health, KRG

Stage 4 of the Electrical Power Substations in the Sulaymaniyah Governorate

Project consisting of designing, Engineering, Equipment Purchasing, Construction, Testing and Commissioning of five (5) new 33/11KV Substations, extension of five (5) 132/33/11KV Substations and extension of one (1) 33/11KV Substation.

  • Duration: 21 months
  • Commencement date: 25.05.2009
  • Completion Date: 06.04.2011
  • Budget: $ 58,391,302
  • Employer: Ministry of Electricity, KR